1. Process description:

The LNG and LCNG joint construction station is capable of LNG filling and CNG adding qigong at the same time. The liquefied natural gas transported by the LNG tank truck or container tank truck is pressurized by the unloading booster gasifier to discharge the LNG to the storage tank for storage. The liquid outlet of the storage tank is divided into two channels, which respectively supply LNG automobile filling system and LCNG automobile filling system.

2. Main components:

LNG storage tanks, multi-function, BOG, heater, pressurized gasification device, EAG heater BOG, adjustable dividers and buffer tank, BOG, compressor, LNG cryogenic submersible pump lever, charging machine, LNG cryogenic pry, high-pressure plunger pump or air temperature evaporator, forced the complex heat exchanger with carburetor, sequential control plate, gas storage, gas bomb group), and qi activity (column), site control system, security system and other auxiliary equipment.

3.the main use:

LNG is added for city buses, provincial buses and heavy freight trucks, and CNG is added for city buses, taxis and private cars.


改图1.jpgLNG、LCNG合建站

添加5.jpgLNG、LCNG合建站LNG、LCNG合建站LNG、LCNG合建站LNG、LCNG合建站

价格
¥0.00