1.Process description
LNG combined construction station refers to the integrated LNG station with multiple functions, including LNG filling function, L-CNG adding qigong function, LNG storage and gasification function and LNG filling function based on a large integrated station.
2.the main components
LNG cryogenic storage tank, air temperature type evaporator, heat exchanger, BOG, heater, EAG heater and tank pressurization gasification unit, tank pressurization gasification device, add smelly device measuring voltage regulator, the convergence of LNG cylinders filling device, LNG cryogenic submersible pump, charging machine, LNG cryogenic pump, high pressure air temperature evaporator, high pressure heater, sequential control plate, gas storage well (gas bomb group), and qi activity (column) control system, security system and other auxiliary equipment.
3. the main use
Used in city, industrial gas supply, LNG, CNG car gas and other LNG utilization process.



